The short answer: Alang-Sosiya, a 10-km stretch of beach in Gujarat's Bhavnagar district, is where most of the world's old ships come to be cut up. Since March 1983 it has taken apart 8,956 vessels weighing 7.13 crore tonnes of steel and equipment, and in 2025 India handled 35.4% of global ship recycling, the largest share of any country 1, 3. But the yard is running far below capacity: 119 ships came in FY2025-26, against 415 in the boom year of 2011-12 1, 11, 13.

Key numbers
Ships recycled at Alang, FY2025-26 119 ships, 10.87 lakh LDT 1
Ships recycled, March 1983 to March 2026 8,956 ships, 7.13 crore LDT 1
Recycling plots 150 in total, 128 operational, 115 compliant with the Hong Kong Convention 1
Peak year 415 ships in 2011-12 11, 13
India's share of global ship recycling, 2025 35.4%, or 2.99 million gross tonnes 3
Alang's share of India's ship recycling About 98% 3
Yard capacity vs use About 4.5 million LDT a year of capacity 2; FY2025-26 used about 24% of it (our calculation from 1, 2)
Price paid per LDT, late September 2026 India USD 465, Bangladesh about USD 500, Pakistan about USD 510 (dry bulk ships) 16

The town in one picture

Alang sits on the Gulf of Khambhat, about 9 km from the town of Trapaj on National Highway 51. The yard runs about 10 km along the coast, across the villages of Bharapara, Alang, Manar, Sosiya and Jaspara 2.

What makes it work is the sea itself. The beach is low and shallow, and the tide is huge. The Gujarat Maritime Board's (GMB) own survey puts the highest astronomical tide at 10.77 metres and the mean high water of spring tides at about 9 metres 2. On a big spring tide, a ship running at speed can be driven far up the mud flat. When the water drops, it sits on dry ground where workers can reach it. The gulf also shelters ships at anchor during bad weather 10.

Walk inland from the plots and the whole economy is on view. Along the road to Alang, warehouses sell everything taken out of ships, from dishes to diesel main engines 9. Further away, in and around Bhavnagar, the steel ends up in more than 60 induction furnaces and 80 re-rolling mills, according to Al Jazeera's December 2025 reporting 13. These units make TMT bars and other building material.

The labour is mostly male and migrant. The master plan GMB published in February 2026 says most workers come from Uttar Pradesh, Bihar and Odisha 2.

How it began

Ship breaking at Alang began in the early 1980s. GMB dates the industry to 1982, and the Directorate General of Shipping (DGS) counts ships from March 1983 1, 2. By 1990, more than 100 ships a year were landing on the beach 2. GMB has leased beach-front plots to ship breakers since 1994. Plot widths range from 30 to 120 metres 9, 10.

The industry's legal history runs through the Supreme Court. In a public interest case on hazardous waste (Writ Petition 657 of 1995), the court passed orders on 14 October 2003, 6 September 2007 and 11 September 2007. Those orders set up a Technical Expert Committee and laid down a procedure for anchoring, beaching and breaking ships that applies in every coastal state 8.

In July 2012 the same case decided the fate of the Oriental Nicety, the former Exxon Valdez. The court allowed it to be dismantled at Alang. It also directed that any toxic material found in the ship's structure be disposed of at the cost of the buyer, Best Oasis Ltd 8. In 2020 the National Green Tribunal held that beaching was permissible, relying on the 2007 Supreme Court judgment 10.

Then came national law. On 20 November 2019 the Cabinet approved the Recycling of Ships Bill and India's accession to the Hong Kong International Convention 6. The Recycling of Ships Act, 2019 followed (Act 49 of 2019) 5. The Ship Recycling Rules came in February 2021 and the Ship Recycling Regulations in January 2026 4. The Hong Kong Convention entered into force worldwide on 26 June 2025 3.

How the business works

Buying a ship by the tonne

A ship at the end of its life is sold mostly for its weight. The unit that matters is LDT (light displacement tonnage): the weight of the ship with its permanent equipment, but without cargo 2. An owner can sell straight to a ship breaker, use a broker, or sell to a "cash buyer". Cash buyers are trading firms such as GMS or Wirana that buy the ship and then resell it to a breaker 10.

Prices are quoted in US dollars per LDT and move every week. In GMS's indications for late September 2026, Alang was paying USD 465 per LDT for a dry bulk carrier and USD 485 for a tanker. Bangladesh was at about USD 500 and 520, and Pakistan at about USD 510 and 530 16.

To put that in rupees: a 10,000 LDT bulk carrier at USD 465 comes to about Rs 44 crore. A USD 35 per tonne gap on the same ship is about Rs 3.3 crore (our calculation, at the November 2026 rate of Rs 94.32 to the dollar used by SMM 17). For a ship breaker, that gap decides who wins the ship.

From anchorage to the beach

A ship cannot simply sail onto the sand. The National Maritime Foundation, following the process described by IIT Bombay researchers, sets out ten steps 10:

  1. The ship anchors about 12 nautical miles off Ghogha port. Customs boards it and clears it. GMB and the Gujarat Pollution Control Board (GPCB) check its Inventory of Hazardous Materials.
  2. The buyer gets permission from GMB and GPCB to beach the ship at a particular plot.
  3. After beaching, oil is drained from bilges and tanks. Oily waste goes to a common hazardous waste treatment, storage and disposal facility set up by GMB.
  4. GMB's safety officer marks gas cylinders, batteries and chemicals, which are removed and stored.
  5. Bilge water and related wastes are collected and disposed of.
  6. GPCB issues a decontamination certificate and GMB issues a hot work permit.
  7. Usable items, from furniture to machinery, are listed and sold to the highest bidder.
  8. Trained workers remove asbestos, glass wool and thermocol.
  9. Gas cutters slice the hull into large sections at high tide. Winches pull the sections down into the intertidal zone, where they are cut smaller at low tide and carried ashore.
  10. Good steel goes to re-rolling mills to become plates, bars and rods. The rest is sold as melting scrap.

The Supreme Court's 2012 order shows how many offices are involved. GMB, GPCB, Customs, the Explosives Department and the Atomic Energy Regulatory Board all boarded the Oriental Nicety before it was allowed in 8. Under the 2019 Act, every ship needs a ship-specific recycling plan approved by the competent authority. If the authority does not decide within 15 days, the plan is deemed approved. Every ship also needs a "ready for recycling" certificate, valid for three months 5.

Who does the work

Jobs on a plot have their own names. JICA's 2017 survey for GMB listed the mukadam (plot supervisor), the battiwala (gas cutter), the malpani (who sorts non-ferrous metal) and the jodiwala (who handles plates and ropes), along with crane and winch operators. Monthly wages then ranged from Rs 8,000-10,000 for unskilled work to Rs 17,000-20,000 for a safety officer 9.

Where the money goes

The breaker's income comes from three streams. The largest is steel plates that can be re-rolled. Then there is melting scrap, and then the second-hand goods trade. Plate earns more than scrap. In October 2026, ex-yard Alang prices averaged Rs 42,495 a tonne for 12 mm plate and Rs 37,610 for melting scrap, a difference of about 13% (our calculation from 17).

The Climate Group's December 2024 study found that only about a quarter of the steel recovered from ships reaches induction furnaces as melting scrap. Most of the rest is re-rolled 11.

The numbers

Ships and tonnage by year. GMB and DGS data show a long slide since the peak:

  • 2011-12: 415 ships, the record 13. The Climate Group puts India's 2012 peak at about 38.5 lakh LDT 11.
  • 2013-14: 298 ships 14.
  • 2019-20: 202 ships; 2020-21: 187; 2021-22: 209 (GMB data given to the National Maritime Foundation) 10.
  • 2022-23: 131 ships, 11.47 lakh LDT 10, 15.
  • 2023-24: 125 ships, 9.44 lakh LDT. GMB called this the lowest activity in 16 years 2, 14.
  • 2024-25: 113 ships, 10.06 lakh LDT 15.
  • 2025-26: 119 ships, 10.87 lakh LDT 1.

The average ship in FY2025-26 weighed about 9,140 LDT (our calculation from 1).

Global share. India's share went up even as Alang's numbers stayed low, because the global market shrank too. UNCTAD data cited by the government show India's share rising from 30.1% in 2024 to 35.4% in 2025, with volume up from 1.86 to 2.99 million gross tonnes 3. The NGO Shipbreaking Platform counted 321 ships dismantled worldwide in 2025, 214 of them in South Asia 12. Note that gross tonnage (a measure of a ship's volume) and LDT (its weight) are different units, so the two series cannot be compared directly.

Plots. Alang has 150 demarcated plots, of which 128 are operational and 115 hold Hong Kong Convention compliance 1. By size, GMB counts 66 small plots (1,000-5,000 square metres), 47 medium and 11 large 2. The government gave Rs 53.5 crore of financial help to upgrade yards, which helped 115 facilities reach compliance 3. Al Jazeera reported that yard owners spent between USD 0.56 million and USD 1.2 million each on compliance 13.

Capacity. GMB puts current capacity at about 4.5 million LDT a year. Daily output at full stretch is about 600 LDT, and worker productivity ranges from 0.66 to 1.71 LDT per worker per day 2. Last year's 10.87 lakh LDT used about a quarter of that capacity (our calculation from 1, 2).

Official documents differ here. PIB's August 2026 note says Alang has "around 6 million GT" of capacity and produces about 3.5 million tonnes of steel a year 3. The tonnage actually beached in FY2025-26 was 10.87 lakh LDT 1. Read the 3.5 million figure as capacity, not output.

Workers. No two sources agree:

  • DGS: "15000+" direct jobs 1.
  • GMB's February 2026 master plan: the current workforce is "around 2,500-3,500", down from 30,000-40,000 at the peak 2.
  • The Alang-Sosiya Ship Recycling and General Workers' Association, quoted by Al Jazeera: fewer than 15,000 now, against more than 60,000 at the peak 13.
  • JICA in 2017: about 20,000 direct and 5 lakh indirect 9.

The gap is partly about who is counted: workers on active plots on a given day, or everyone who depends on the yard. Either way, the trend is down sharply.

Steel for India. Sources also disagree on how much the yard matters to India's steel supply. DGS says ship recycling meets 20-25% of India's ferrous scrap requirement 1. JICA in 2017 put it at about 3% of domestic steel consumption 9. The Climate Group estimated that the melting scrap from ships is roughly 1% of India's 33.3 million tonne scrap market in 2024 11. The difference comes from what is counted (re-rolled plate as well as melting scrap) and which year is measured.

What it is up against

Ships that will not retire. When freight rates are high, owners keep old ships working. Ship recyclers told Maritime Gateway that booming freight rates kept fleet owners running their old ships in FY2024-25 15. In Q3 2026 the Baltic Dry Index touched 3,488, its strongest level since October 2021. Very large tanker earnings went above USD 1 million a day, which raised the cost of retiring a ship 16. Haresh Parmar, secretary of the Ship Recycling Industries Association, told Al Jazeera: "When owners are earning well, they don't scrap their vessels" 13.

Being outbid by neighbours. Alang usually pays less per tonne than Chattogram (Bangladesh) or Gadani (Pakistan). In December 2025 Al Jazeera quoted USD 500-510 per LDT at Alang against USD 540-550 at Chattogram 13, and the gap persisted in GMS data in September 2026 16. One ship-breaking executive told Moneycontrol that breakers in Pakistan and Bangladesh were "being compensated by their government" when they bid 14. That is the executive's claim; we found no official confirmation. GMS also notes that Alang now works as two markets. It trails on ordinary bulk carriers and tankers but competes harder for specialist ships such as reefers, gas carriers and passenger vessels 16.

The cost of compliance. Meeting the Hong Kong Convention meant impermeable floors, drainage, cranes, hazardous waste storage and safety systems 3. Yard owners say that raised their costs, and with it the gap with rivals 13. The 2019 Act backs the rules with penalties. Recycling at an unauthorised facility or without an approved plan can bring up to a year in prison, a fine of up to Rs 10 lakh, or both 5.

Safety. The work is dangerous. A GMB environmental study, cited by JICA, found the main causes of fatal accidents at the yard were fire and explosion (26.4%), falls from height (19.47%) and being struck by falling objects (17.07%) 9. JICA also cited a European shipowners' association report of 41 fatal accidents between 2011 and 2015 9.

When a worker was killed by a falling steel plate in June 2022, police filed a negligence case and GMB issued a closure notice to the plot. The yard owner said the plate was toppled by a gust of wind. The industry association asked the state for a fair investigation 18. We could not find a public record of how the case ended.

GMB's 2026 master plan says there is "no recent official count" of accidents and that safety "remains a concern" 2. The NGO Shipbreaking Platform recorded 11 deaths and at least 62 injuries across South Asian yards in 2025 12.

The European door. EU policy bars beaching for EU-flagged ships, and the European List of Ship Recycling Facilities decides which yards they may use 10, 20. Getting Alang yards onto that list has been a long fight.

  • August 2026: The European Commission proposed adding two Alang yards: Shree Ram Vessel Scrap / Shree Ram Shipping Industries and YSI Recyclers 19, 20. They would be the first Indian yards on the list. India's Department of Commerce said this could make India the first non-OECD country with EU-listed yards 19.
  • September 2026: Global shipowner bodies, including BIMCO, the International Chamber of Shipping and the World Shipping Council, urged quick approval 21.
  • Opposition: NGOs, the European steel association EUROFER and unions argued that beaching cannot meet EU standards 20.
  • 4 November 2026: The European Parliament's environment committee voted against including the two yards. A plenary vote was expected later in November, and EU member states also have a say 22, 23.

As of 25 November 2026 we could not find a final decision. Sources put the number of Alang yards that have applied for EU listing at between 29 and 35 2, 3, 19.

Where it is going

A bigger yard. GMB's master plan aims to double capacity from 4.5 million to 9 million LDT a year by 2027, and to reach about 11.3 million LDT by 2038-40. The plan adds about 10 km of new plots to the south. It also favours larger plots of up to 300 metres wide and 215 metres deep, and a "controlled landing" method on impermeable concrete slopes 2. At full build-out it projects 28,000-29,000 direct jobs 2.

A subsidy that links scrapping to shipbuilding. In September 2025 the Cabinet approved a Rs 69,725 crore maritime package. It includes a Shipbreaking Credit Note with an allocation of Rs 4,001 crore 7. An owner who recycles a ship at a certified Indian yard gets a credit note worth 40% of the scrap value. The note is valid for three years and can pay for up to 5% of a new ship ordered from an Indian shipyard 1.

On the 10,000 LDT example above, that is a credit of about Rs 17.5 crore (our calculation). How many owners actually use it is the number to watch.

Better data and green steel. DGS is building a national ship recycling portal. It will cover yard licensing, hazardous material inventories, recycling plans, inspections, accident reports and worker training records 1. DGS also pitches Alang's steel as feedstock for India's new green steel ratings 1. The Climate Group estimates that scrap-based steelmaking emits about 0.53 tonnes of CO2 per tonne, against 2.5-2.8 tonnes for blast furnaces 11.

A large pipeline of old ships. The Climate Group expects about 15,000 ships, around 12.5% of the world fleet, to need recycling over the coming decade 11. The question is not whether ships will need breaking. It is whether Alang can win them on price, on paperwork and on reputation.

What a growing business can take from this

Know the one unit your whole business is priced in, and track it weekly. Alang lives and dies by dollars per LDT. A USD 35 gap on one ship is worth about Rs 3 crore 16. Most businesses have a similar unit, whether rupees per kilo, per square foot or per machine-hour. The ones that survive watch it every week, not every quarter.

Capacity you cannot fill is a cost, not an asset. Alang built for 4.5 million LDT and used about a quarter of it last year 1, 2. Before adding a line, a godown or a branch, plan for a demand cycle that can stay low for years.

Compliance is a sales document. Yards that invested early in certification are the ones now considered for European ships 19. If your buyers are large companies or exporters, audit-ready records of safety, quality and waste are what get you onto the approved vendor list.

Price the by-products, not just the main product. A breaker earns from plate, melting scrap and second-hand fittings, and plate sells for about 13% more than scrap 17. Many manufacturers write off off-cuts, rejects and returns that could be graded and sold.

When figures disagree, find out why before you decide. Official sources on Alang differ widely on jobs and on steel output 1, 2, 3, 13. Your own reports can do the same when sales, stores and accounts each count differently. Agree on one definition first.

A policy incentive only works if you can prove eligibility. The credit note pays only for ships recycled at certified yards 1. Government schemes almost always need clean records. Businesses that keep them can claim, and those that do not leave money behind. Gujarat's other clusters, from Morbi's tile makers to Jamnagar's brass-parts units, face the same test.

Running a business like this?

Alang's problems show up in any growing business: knowing what you paid, what you recovered and what each grade sold for; never missing a permit when the inspector arrives; and keeping every worker's shift and training on record. OneHash puts this in one system, with purchase management, inventory and warehouses by grade, manufacturing, quality control, approval chains, shift and attendance, payroll, and profitability insights in reports and dashboards. See how it works for manufacturing and trading businesses.

Based on public records and reporting as of 25 November 2026. For general reading; not investment, tax or legal advice.

Questions people ask

How many ships are broken at Alang every year?

Alang recycled 119 ships weighing 10.87 lakh LDT in FY2025-26, according to the Directorate General of Shipping. The record was 415 ships in 2011-12.

Why is Alang good for ship breaking?

The beach is low and shallow and the tidal range is very large, with the highest astronomical tide at about 10.8 metres. Ships can be driven far up the mud flat on a high tide and worked on at low tide.

How many plots are there at Alang-Sosiya?

Alang has 150 recycling plots, of which 128 are operational and 115 are compliant with the Hong Kong Convention, according to DGS data for March 2026.

How are ships sold for scrap to Alang?

Ships are sold mainly by weight, priced in US dollars per light displacement tonne (LDT), either directly to a ship breaker, through a broker, or via a cash buyer who resells to the breaker. In late September 2026 Alang was paying about USD 465 per LDT for a dry bulk carrier.

What law governs ship recycling in India?

The Recycling of Ships Act, 2019, with the Ship Recycling Rules, 2021 and the Ship Recycling Regulations, 2026. India acceded to the Hong Kong Convention, which entered into force on 26 June 2025.

Are Alang yards on the EU approved list?

The European Commission proposed adding two Alang yards in 2026, but the European Parliament's environment committee voted against them on 4 November 2026. As of 25 November 2026 no final decision had been found.

What is the ship breaking credit note?

Under the shipbuilding financial assistance scheme, an owner who recycles a ship at a certified Indian yard gets a credit note worth 40% of its scrap value, valid for three years and usable for up to 5% of the price of a new ship built in India.

Sources

  1. HKC @ One: Strengthening Global Governance for Sustainable Ship Recycling - Directorate General of Shipping, Jun 2026
  2. Master Planning for Capacity Enhancement and Expansion of Alang Sosiya Ship Recycling Yard, Final Master Plan Report - Gujarat Maritime Board, Feb 2026
  3. Ship Recycling in India: Regulatory Transformation and Global Leadership - PIB Research, Aug 2026
  4. Ship Recycling in India - Directorate General of Shipping, Nov 2026
  5. The Recycling of Ships Act, 2019 (Act 49 of 2019) - India Code, Dec 2019
  6. Cabinet approves Recycling of Ships Bill, 2019 and accession to the Hong Kong Convention - PIB, Nov 2019
  7. Cabinet approves Rs 69,725 crore package to revitalise shipbuilding and maritime ecosystem - PIB, Sep 2025
  8. Research Foundation for Science, Technology and Natural Resource Policy vs Union of India, order in I.A. 61 and 62 of 2012 in WP(C) 657 of 1995 - Supreme Court of India, Jul 2012
  9. Preparatory Survey on the Ship Recycling Yard Improvement Project in India, Final Report (Draft) - JICA and Gujarat Maritime Board, Jul 2017
  10. Sustainable Ship Recycling in India: Legal, Economic and Political Analysis - National Maritime Foundation, Feb 2024
  11. Turning the Tide: Ship Recycling as a Source of Green Steel in India - Climate Group and Climate Catalyst, Dec 2024
  12. Platform publishes list of ships dismantled worldwide in 2025 - NGO Shipbreaking Platform, Feb 2026
  13. 'No work': India's Alang, the world's largest graveyard of ships, is dying - Al Jazeera, Dec 2025
  14. Alang ship recycling falls to 16-year low; only 125 ships scrapped in FY24 - Hellenic Shipping News (from Moneycontrol), Apr 2024
  15. Alang beached 113 ships for recycling in FY25 - Maritime Gateway, Apr 2025
  16. The Ships Stayed Trading: What Q3 2026 Revealed about the Ship Recycling Market - GMS via Hellenic Shipping News, Oct 2026
  17. Alang ship recycling activity increases in October, but recovery remains limited - Shanghai Metals Market, Nov 2026
  18. Alang ship recycling industry fears worker's death may hurt global image - Business Standard, Jun 2022
  19. Big news for ship recycling in India: 2 Alang yards added to EU list of approved facilities - The Week, Aug 2026
  20. EU ship recycling fight escalates over Indian beaching yards - gCaptain, Sep 2026
  21. Joint industry statement on Indian recycling yards and the EU list - BIMCO, Sep 2026
  22. What's next for 2 Alang ship recycling yards after major setback from European Parliament panel? - The Week, Nov 2026
  23. EU Parliament committee opposes approval of Indian ship recycling yards - Safety4Sea, Nov 2026