Bhiwandi Powerloom and Warehousing Hub: How It Works
Bhiwandi powerloom cluster and warehousing hub explained: job work, loom counts, power costs, Rs 21-25 rents and 90% of Mumbai's warehouse leasing.
The short answer: Bhiwandi, about 30 km from Mumbai in Thane district, is two business towns stacked on top of each other. The older one weaves grey (unfinished) cloth on lakhs of second-hand powerlooms, mostly as job work for master weavers and traders, and has been shrinking for two decades. The newer one is India's largest warehousing cluster, which took 90% of the Mumbai region's warehouse leasing in 2025 and stores goods for e-commerce, FMCG and 3PL companies that serve western India 1, 8.
| Key numbers | |
|---|---|
| Powerlooms still running (estimates) | About 3 lakh (AP, Mar 2025) to 4-5 lakh (Free Press Journal, Sep 2025) 13, 14 |
| Powerlooms at the peak (estimates) | 12 lakh in an NI-MSME study from around 2012-13; "about 14 lakh" falling to "about 6 lakh" per a 2024 trade magazine 1, 23 |
| Mumbai region warehouse stock | 192.1 mn sq ft, 33% of India's eight big markets (H1 2026) 9 |
| Bhiwandi's share of Mumbai warehouse leasing | 90% of 13.5 mn sq ft (2025) 8 |
| Bhiwandi Grade A warehouse stock | About 42 mn sq ft, the largest single cluster in India (2026) 10 |
| Grade A warehouse rent in most Bhiwandi locations | Rs 21-25 per sq ft per month (2025) 8 |
| Electricity losses in the Bhiwandi power circle | About 58% when Torrent Power took over; about 9.1% in FY26 6 |
| Bhiwandi-Nizampur population | 7,09,665, with 415,339 men and 294,326 women (Census 2011) 7 |
The town in one picture
Walk through old Bhiwandi and you hear it before you see it: rooms full of plain shuttle looms, many bought decades ago from the closed composite mills of Mumbai, running long shifts on synthetic and cotton yarn 1, 13. Out along the highways the landscape changes to steel sheds the size of football fields, with trucks lined up outside, where companies such as DHL, Toll India, Zomato's Hyperpure and Godrej Consumer Products took space in 2025 8.
The two economies share roads, labour and land, and increasingly one is replacing the other. Landowners who once farmed now go into joint ventures with warehouse builders 26. The town that was called the "Manchester of India" for its looms is now, in the words of property consultant Knight Frank, "Mumbai's primary warehousing node" 8, 21.
The population tells a story too. Census 2011 counted 7,09,665 people in Bhiwandi-Nizampur, with only about 709 women for every 1,000 men (our calculation from the census counts) 7. That is consistent with a town built on migrant men, most of them from Uttar Pradesh and Bihar, who work the looms and send money home 1, 21.
How it began
Bhiwandi's powerloom trade boomed in the 1970s and 1980s, when thousands of small, family-run units grew up and lakhs of migrant workers came in 22, 23. The big push came from Mumbai's mill economy. As the city's composite mills and NTC units shut, their old plain looms were sold off, and weavers and technicians from those mills set up in Bhiwandi with them 1.
Most owners started the same way: 4 to 8 looms at home, growing to 16 to 48 looms in the same lane, so that home and factory were often one building 1. A study by the National Institute for MSME (NI-MSME), an organisation of the Ministry of MSME, describes it as "a cottage industry and house cum workplaces" 1.
The decline started in the early 2000s, as cheaper imports and Surat's newer looms took market share 22. You can read how Surat modernised in our piece on the Surat diamond and textile cluster.
How the loom business works
Yarn in, grey cloth out
The product is mostly grey fabric, plain woven cloth that someone else will bleach, dye or print, later used for shirting and dress material. Some units also weave dyed lungis, sarees and towels on looms fitted with dobby or jacquard attachments 1. Bhiwandi does very little garmenting itself 1.
Almost everything flows through local middlemen. In NI-MSME's survey of 150 units, 84% bought yarn from local vendors, only 6% bought directly from mills, and just 3% pooled their purchases 1. On the selling side, 57% sold to local traders, 15% did regular job work for exporters, and only 12% sold through their own agents in Mumbai, Ichalkaranji, Jaipur or Ahmedabad 1.
After weaving, the cloth leaves town. A 2024 report in the Clothing Manufacturers Association of India's magazine lists processing centres it goes to, including Pali, Balotra, Surat, Jodhpur, Jetpur, Sanganer and Bhilwara 23. Bhiwandi's cloth is mostly sold in India; the president of the Bhiwandi Powerloom Weavers' Federation has said only a small share is exported 21.
Who holds the margin
The heart of the system is job work. About 80% of powerloom units in Bhiwandi carry out work orders for master weavers or merchants who sit between the unit owner and the market, NI-MSME found 1. The master weaver supplies yarn and specifications; the unit owner supplies looms, power and labour, and is paid a conversion rate per metre.
That makes the loom owner a price-taker on both ends. Many units take yarn from the same trader who buys their cloth, a barter-like arrangement that leaves the trader setting both prices 1. When times are bad, the squeeze moves down the chain. In March 2026, as yarn prices jumped, master weavers cut job-work rates by 50 to 75 paise a metre, according to owners who spoke to the Free Press Journal 15.
There is a second layer of ownership too. In the NI-MSME sample, 76% of units owned their looms while 24% ran production on rented looms, often from owners who had given up because margins were too thin to upgrade 1.
Money and machines
The looms are old. NI-MSME found 63% of sampled units ran plain looms only, and described many as 50 to 75 years old 1. Only about 9% of the sample had shuttleless or automatic looms, and across the cluster it counted "more than 2000" rapier and Sulzer looms, nearly all with large owners 1.
Money is the reason. In the study's numbers, four plain looms could be set up for about Rs 1 lakh, while one automatic loom cost Rs 8 to 15 lakh, and Chinese models started at about Rs 4 lakh 1. Owners funded about 80% of their investment from their own money, relatives and friends; banks provided only about 4% 1.
Government schemes did not bridge the gap. The Technology Upgradation Fund Scheme needed a bank term loan, a 15% upfront contribution and approved machinery, and plain looms were not eligible 1. Most small units dealt in cash and filed minimal returns, so they had no track record a bank would lend against 1. When textile institute SASMIRA, SIDBI and the powerloom export council tried to modernise 100 units, 28 were identified and only 7 got loans 1.
Workers on piece rate
Workers are paid by output, weekly, and usually are not on the company rolls, which means no provident fund, ESI, paid leave or bonus, NI-MSME reported 1. Owners in turn complained of absenteeism of one to three days after every weekly payout 1.
The work has intensified. Where one worker once tended six looms, one may now handle 14, according to reporting by The Migration Story in October 2025 21. New workers can start at over Rs 15,000 a month 21. A migrant weaver interviewed by the Free Press Journal in September 2025 said he earned Rs 15,000 to 18,000 a month 14.
Power: the bill that decides margins
Power is the other input that decides margins; AP lists costlier electricity among the causes of the cluster's decline 13. Bhiwandi's supply has its own history. In January 2007, Torrent Power took over electricity distribution in the Bhiwandi circle as a franchisee of the state utility MSEDCL, the first arrangement of its kind in India 24. The franchise covers about 721 sq km; its aggregate technical and commercial losses fell from about 58% at takeover to about 9.1% in FY26, with peak demand of 634 MVA 6.
On top of that, Maharashtra gives textile units a concessional power tariff, with slabs by connected load: below 27 HP, 27 to 201 HP, and 201 HP and above 5. Getting it now requires online registration with the state's textile commissionerate, and in May 2026 the state extended the deadline to 14 August after owners in Bhiwandi, Malegaon and Ichalkaranji reported trouble with the process 17. Some owners say payments arrive late: one second-generation owner told the Free Press Journal in 2025 that he had not received his subsidy for three years 14.
How the warehouse business works
Bhiwandi's second economy grew on land, location and labour. It sits close to Jawaharlal Nehru Port and has direct access to the Mumbai-Ahmedabad and Mumbai-Nashik highways 10. Land was available at a fraction of Mumbai prices, and local landowners entered joint ventures with warehouse builders 26.
The modern phase is recent. Institutional developers such as IndoSpace, ESR and Welspun One now build Grade A parks in Bhiwandi 8. The cluster is spread across villages such as Mankoli, Kalher, Kashele, Dapode, Padgha, Vashere, Vadpe, Sape, Lonad, Sonale and Anjur Phata 8.
Who rents the space has shifted. In 2025, 3PL operators took 44% of Mumbai region leasing, and manufacturing occupiers rose from 22% to 32%; e-commerce held steady at 7% 8. Some single deals are huge: Swiggy-owned Scootsy Logistics leased about 5.8 lakh sq ft at One K Square Logistic Park 27.
Prices have climbed. Industry reporting put Bhiwandi rents at Rs 14 to 22 per sq ft per month in 2018 26. By 2025, Grade A space in most Bhiwandi micro-markets rented for Rs 21 to 25, and up to Rs 25 to 30 in Dohale and Koshimbi, while land cost Rs 18 to 32 million an acre, or Rs 1.8 to 3.2 crore (our conversion) 8.
The roads keep getting better. The final 76 km of the Samruddhi Mahamarg, ending at Amane in Bhiwandi taluka, opened on 5 June 2025, completing a 701 km expressway that cuts Mumbai-Nagpur travel to about eight hours 25. In 2026 Knight Frank also pointed to the completed Western Dedicated Freight Corridor, of which Mumbai is the southern end, as a reason manufacturing and 3PL occupiers were drawn to the Mumbai market 9.
For how stock moves from big regional warehouses to the last mile, see our piece on Zepto's dark stores.
The numbers
Nobody agrees on how many looms Bhiwandi has, and the gap is large.
| Estimate of Bhiwandi powerlooms | Source and period |
|---|---|
| 12 lakh (the same study also says 7 lakh elsewhere) | NI-MSME study, about 2012-13 1 |
| Fell from about 14 lakh to about 6 lakh | CMAI's Apparel magazine, Apr-Jun 2024 23 |
| Fell from about 10 lakh to 3 lakh | A unit owner and federation director, Oct 2025 21 |
| About 3 lakh still running; about 30% shut in recent years | AP, citing the weavers' federation, Mar 2025 13 |
| 4 to 5 lakh running, from a peak of about 8 lakh | Free Press Journal report, Sep 2025 14 |
The national baseline is firmer. A 2013 baseline survey, cited by the Minister of State for Textiles in a December 2025 Rajya Sabha reply, counted 24,86,418 powerlooms in 3,85,596 units across India, employing 44,18,240 workers 11. By that count, the NI-MSME figure of 12 lakh would be close to half of India's looms, which suggests local estimates have always been rough. For Maharashtra as a whole, the Free Press Journal, reporting a state legislator's appeal for relief in April 2026, put the count at about 9.48 lakh powerlooms, around 39% of India's 16.
NI-MSME's study put the cluster's turnover at about Rs 10,000 crore a year and said it supported about 20 lakh people, workers and families together 1. Those figures predate the decline that owners describe since.
On the warehouse side the numbers are better recorded, though consultants define markets differently:
- Leasing: Mumbai region leasing rose from 8.8 mn sq ft in 2023 to 10.3 mn sq ft in 2024 and 13.5 mn sq ft in 2025, with Bhiwandi taking 90% 8. That is roughly 12 mn sq ft for Bhiwandi in 2025 (our calculation).
- Momentum: In H1 2026, Mumbai leasing rose 44% year on year to 10.7 mn sq ft, the largest half-yearly total of any Indian market and about 29% of national demand 9.
- Stock and vacancy: The Mumbai market held 192.1 mn sq ft with 15.3% vacancy in H1 2026, and only 35% of it was Grade A, because much was built before modern standards took hold 9.
- Rents: Average Mumbai warehouse rent was Rs 26.0 per sq ft per month in H1 2026, up 5% 9.
What it is up against
Old looms and thin capital. Most of the cluster still runs plain looms that cannot match the speed or quality of shuttleless looms, and small owners lack the books and collateral to borrow for new ones 1, 13.
Yarn prices. In NI-MSME's survey, 21% of owners named yarn price swings as their top problem; they had often signed sale prices before the yarn bill rose 1. In March 2026, the war in West Asia pushed yarn up by Rs 30 to 35 a kg; one owner said 92-count yarn went from Rs 2,060 to about Rs 2,200 for five kg 15, 16. A state legislator cited state textile corporation data showing the state's textile industry lost nearly Rs 4,000 crore in March 2026, with some units cutting production to two days a week 16.
Policy has moved in the weavers' favour on inputs. The GST on man-made fibres was cut from 12% to 5% in September 2025 to fix the inverted duty structure 4. In November 2025 the government withdrew quality control orders on polyester fibre and yarn and their raw materials, which industry body CITI said would give users access to raw materials at internationally competitive prices 19, 20.
Labour. As far back as the NI-MSME study, 85% of owners said labour had fallen over the previous five years, and young people were not joining 1. Owners still cite labour shortages, while workers cite long hours, piece rates and poor housing 1, 21.
Trade shocks. When the US imposed a 50% tariff on Indian goods in August 2025, Bhiwandi's local MLA wrote to the Chief Minister warning of the impact 14. In February 2026 the 25% Russia-oil penalty was removed, and after a US Supreme Court judgment on 20 February the reciprocal tariffs were no longer in force; an interim India-US trade agreement was announced but, as of March 2026, not concluded 3. Because most Bhiwandi grey cloth is sold within India, the weavers' federation president has said only a small share is exported, which limits the direct exposure 21.
Missed cluster schemes. A Bhiwandi Powerloom Mega Cluster was announced in 2008-09 but cancelled because of "non-availability of land and poor response from the stakeholders/State Government," according to the Ministry of Textiles 2. Ichalkaranji's mega cluster, sanctioned in 2012, has received Rs 44.85 crore from the Centre 12.
Unplanned growth in the warehouse belt. In 2019 the regional planning authority MMRDA said it would develop parts of the 15,000 hectare Bhiwandi Surrounding Notified Area as a logistics hub 28. Enforcement is now catching up with construction. In February 2026, revenue officials demolished nearly 50 warehouses on government mangrove and saltpan land at Kasheli after Bombay High Court directions, the Free Press Journal reported 29. In June 2026, MMRDA began demolishing structures it identified as unauthorised at Rajlaxmi Compound in Sonale under court directions; officials said due process was followed, and the underlying dispute remains before the court 30. For tenants, the lesson is to check title and approvals, not just rent.
Where it is going
The weaving side is consolidating. Fewer, larger units with automatic looms appear likely to carry the cluster's output, while the smallest plain-loom units either rent out their looms or close 1, 13. Politicians are still asking for help: in February 2026 Bhiwandi MLA Mahesh Choughule sought approval for a Mega Textile Park, and he said the Chief Minister directed the department to examine it 18. In a February 2026 Rajya Sabha reply, the Centre named Bhiwandi among the key clusters its powerloom schemes support 12.
The warehouse side is still expanding, but it is running out of easy land. Knight Frank expects Bhiwandi to stay dominant in the near term, while limited large contiguous parcels push occupiers toward Panvel, Taloja and Patalganga 8. Better roads, the freight corridor and the Navi Mumbai airport should keep demand strong; the question is how much of it Bhiwandi can hold 8, 9.
The likely future is a town that weaves less and stores and ships more. Other textile towns have found different ways to survive; Panipat's textile recycling hub rebuilt itself around a new raw material.
What a growing business can take from this
Know who sets your prices before you add capacity. In Bhiwandi, most loom owners added looms but left the trader in charge of both the yarn price and the cloth price 1. Before expanding, map who controls your input cost and your selling price. If it is the same party, more capacity mostly makes their business bigger.
Clean books are a cost-of-capital decision. Small loom owners missed technology subsidies because they could not show a bank three years of credible accounts 1. A business that wants cheap credit later needs bank-friendly books now.
Write the input clause into the contract. Owners lost money when yarn rose after sale prices were fixed 1, 15. For any product where one input is more than a third of cost, quote with a validity date or an input-linked price clause, and track cost per unit weekly.
Treat subsidies as a process, not a windfall. Power concessions in Maharashtra now depend on registration, slabs and paperwork, and some owners report delays 5, 14, 17. Someone in the business should own each subsidy, with a calendar and a file.
Watch what your land is worth in another use. Bhiwandi landowners who switched to warehousing earned more from the same ground than many loom owners did 8, 26. Every few years, compare what your site earns from production with what it could earn leased or redeveloped.
Design pay around attendance. Weekly piece-rate payouts came with one to three days of absence after payday 1. Attendance-linked incentives and visible skill grades can stabilise a shop floor.
Running a business like this?
A growing weaver, trader or warehouse operator faces the same problems Bhiwandi does: yarn bought on credit from one party, cloth sold to another, job-work rates that change month to month, piece-rate workers and stock spread across godowns. OneHash puts sales, stock, purchase, production, accounts and HR in one system. Purchase management, inventory and warehouses and manufacturing track yarn in and cloth out. Receivables and payables and profitability insights show which master weaver or buyer actually earns you money. Payroll and shift and attendance handle piece-rate crews. See how it fits manufacturing, trading and logistics.
Based on public records and reporting as of 16 November 2026. For general reading; not investment, tax or legal advice.
Questions people ask
How many powerlooms are there in Bhiwandi?
Estimates vary widely. An AP report in March 2025 put working looms at about 3 lakh, while a Free Press Journal report in September 2025 said 4 to 5 lakh were running, down from a peak of about 8 lakh. An NI-MSME study from around 2012-13 cited 12 lakh.
What does Bhiwandi produce on its powerlooms?
Mostly grey (unfinished) fabric later used for shirting and dress material, plus some dyed lungis, sarees, towels and bed sheets. The cloth is mostly sold in India and processed in other centres such as Pali, Balotra and Surat.
How does job work operate in Bhiwandi's powerloom industry?
An NI-MSME study found about 80% of units work on orders from master weavers or merchants, who supply yarn and pay a conversion rate per metre. Most units buy yarn from and sell cloth to local traders.
Why is Bhiwandi a warehousing hub?
It is close to Mumbai and Jawaharlal Nehru Port, has highway access towards Ahmedabad and Nashik, and had large land parcels available. In 2025 it accounted for 90% of the Mumbai region's warehouse leasing, according to Knight Frank.
What is the warehouse rent in Bhiwandi?
Knight Frank put Grade A rents in most Bhiwandi micro-markets at Rs 21 to 25 per sq ft per month in 2025, with Dohale and Koshimbi at Rs 25 to 30. Land cost Rs 18 to 32 million an acre.
Who supplies electricity in Bhiwandi?
Torrent Power has distributed electricity in the Bhiwandi circle since January 2007 as a franchisee of MSEDCL, the first such arrangement in India. Its losses fell from about 58% at takeover to about 9.1% in FY26.
Why has Bhiwandi's powerloom industry declined?
Old plain looms, volatile yarn prices, labour shortages, thin access to bank credit and competition from modern looms and imports. A planned Bhiwandi Powerloom Mega Cluster announced in 2008-09 was cancelled for lack of land and poor response.
Sources
- Socio-Economic Status of Entrepreneurs and Workforce of the Bhiwandi Textile and Apparel Cluster - NI-MSME, Ministry of MSME, Jan 2013
- Annual Report 2023-24 - Ministry of Textiles, Nov 2024
- Lok Sabha Unstarred Question 4090 on US tariffs - Ministry of Commerce and Industry, Mar 2026
- GST Reforms in MSME factsheet - Press Information Bureau, Sep 2025
- Electric subsidy registration form for textile units - Commissionerate of Textiles, Government of Maharashtra, Nov 2024
- Investor Presentation Q1 FY2026-27 - Torrent Power (NSE filing), Aug 2026
- Bhiwandi Nizampur population, Census of India 2011 - City Population, Mar 2011
- India Warehousing Market Report 2025 - Knight Frank, Mar 2026
- India Warehousing Market Report H1 2026 - Knight Frank, Aug 2026
- 13 Industrial and Warehousing Hubs to Drive India's Growth: Colliers - NBM&CW, Aug 2026
- Powerloom Sector in India's Textiles (Rajya Sabha reply) - Technical Textiles, Dec 2025
- Multiple schemes rolled out for powerloom sector development, says MoS Textiles - KNN India, Feb 2026
- Decades-old weaving businesses near Indian financial capital struggle to survive - AP via The Star, Mar 2025
- US Tariffs Push Bhiwandi's Powerloom Industry Into Crisis - Free Press Journal, Sep 2025
- Bhiwandi Powerloom Crisis Deepens As Yarn Prices Surge, Demand Slumps - Free Press Journal, Mar 2026
- SP MLA Rais Shaikh urges relief to textile sector as raw material prices surge - Free Press Journal, Apr 2026
- Maharashtra extends powerloom subsidy registration deadline until August 14 - Free Press Journal, May 2026
- Bhiwandi MLA Mahesh Choughule urges CM to approve Mega Textile Park - Free Press Journal, Feb 2026
- Government withdraws 14 Quality Control Orders including polyester fibre and yarn - Free Press Journal, Nov 2025
- Revoking quality control order on polyester fibre, yarn to benefit textile sector: CITI - PTI via The Week, Nov 2025
- Once Manchester of India, Bhiwandi's textile mills lose their thread - The Migration Story, Oct 2025
- Bhiwandi's Looming Crisis: Powerloom Struggles, Fund Misallocation and Housing Gaps - Outlook, Oct 2025
- The Manchester of India, Manufacturing Cluster News - CMAI Apparel magazine, Jun 2024
- Torrent cuts T&D losses in Bhiwandi franchisee area - T&D India, Jul 2020
- Final stretch of 701-km-long Mumbai-Nagpur Samruddhi Expressway opened - PTI via The Week, Jun 2025
- Decoding warehousing boom in Bhiwandi and Panvel - Maritime Gateway, Aug 2018
- Bhiwandi to Taloja: Mumbai's logistics map gets redrawn - Indian Transport and Logistics News, Jul 2025
- Now MMRDA to develop Bhiwandi as logistics hub - Free Press Journal, May 2019
- Bhiwandi encroachment crackdown: nearly 50 illegal warehouses demolished on mangrove land after Bombay HC orders - Free Press Journal, Feb 2026
- MMRDA begins action against allegedly unauthorised warehouses in Rajlaxmi Compound - Free Press Journal, Jun 2026