Hosur Auto Component and EV Cluster: How It Works
Hosur auto component and EV cluster explained: TVS, Ashok Leyland, Ather, Ola, about 3,000 MSMEs, SIPCOT parks, job work and the switch to EV parts.
The short answer: Hosur is a town in Krishnagiri district, Tamil Nadu, about 40 km from Bengaluru. Since the 1970s it has grown around two vehicle makers, TVS Motor and Ashok Leyland, and around 3,000 small engineering firms that press, machine, weld and mould parts for them. Today the same district is also home to the factories of three of India's biggest electric scooter makers, TVS, Ather and Ola. That makes Hosur one of the few places where you can see the switch from petrol engines to batteries happening on the same streets.
| Key numbers | |
|---|---|
| SIPCOT Hosur industrial park (Phase I and II) | 2,093 acres 1, 2 |
| MSMEs in and around Hosur | About 3,000, plus about 500 big industries (2025) 51 |
| Udyam-registered MSMEs in Krishnagiri district | 1,03,019 (1 July 2020 to 5 August 2024) 5 |
| Direct jobs in the district's auto component industry | Nearly 1 lakh, plus more than 50,000 indirect 4 |
| Ather's Hosur factory capacity | 4.2 lakh scooters and 3.8 lakh battery packs a year (Dec 2024) 14 |
| Ola Futurefactory capacity, Krishnagiri | 10 lakh scooters a year (March 2024) 16 |
| Share of India's FY26 e-2W registrations won by TVS, Ather and Ola | About 53% (our calculation) 41 |
| India's auto component industry turnover, FY26 | Rs 7.59 lakh crore 24 |
The town in one picture
Drive out of Bengaluru's Electronic City towards the Tamil Nadu border, and the first big town you reach is Hosur. Hosur became a city corporation in February 2019, and the 2011 Census counted 2,45,354 people living there 7. Krishnagiri district as a whole had 18.8 lakh people in 2011 6.
What makes Hosur unusual is its mix. A planning document from the Tamil Nadu MSME Department says the town has "more than 2000 general engineering enterprises" making everything "from pins to aircrafts" 4. At the top of the chain sit vehicle makers. TVS Motor's head office and one of its three Indian plants are in Hosur 9, and Ashok Leyland runs three plants there 13. Others include Titan, whose registered office is in the SIPCOT industrial complex and whose watch and jewellery factories are in Hosur 19. Caterpillar's Perkins brand makes up to 16,000 engines a year there 20. Tata Electronics runs a plant near Hosur that, Tata Sons chairman N Chandrasekaran said in September 2024, employed 20,000 people, more than 15,000 of them women 48.
Below them sit the small firms. In 2025 Deccan Herald put the town at about 500 big industries and 3,000 MSMEs 51. A 2024 study by the research group iFOREST with CII counted 759 auto component makers in Hosur, 95% of them MSMEs, as reported by DT Next 33.
The district plan says auto components alone give nearly 1 lakh direct jobs and more than 50,000 indirect ones 4. A 2019 state skill plan found that manufacturing employs 42% of Krishnagiri's workforce, and that "over two lakh migrant labourers" from eastern states work in the district 6.
How it began
Hosur's industry is not an accident of geography. It was policy.
In the 1970s the Centre declared Hosur a "backward area", which meant incentives for anyone who set up there. Ashok Leyland, TVS, Titan and Carborundum Universal took them, Outlook Business reported 36. The Tamil Nadu industrial agency SIPCOT, set up in 1971, laid out the industrial estate. That estate has since grown to 2,093 acres across two phases 1, 2.
The anchor plants came in a steady line. TVS's Hosur plant, now also the company's head office, was among the first 9, 36. Ashok Leyland's Hosur Plant 1 opened in 1980 as the company's second plant and first assembly unit. Today it is the company's centre for engines 13. Plant 2 followed in 1994, and a third plant for sheet-metal stamping came in 2001. That third plant supplies the skin and large panels for more than 90% of Ashok Leyland's trucks 13.
Titan was in the same wave. Its first year of operations was 1987-88, and in that year it became India's leading maker of quartz analogue watches 37.
Being 40 km from Bengaluru helped. Engineers, machine tools and buyers were close by, but land and labour cost less on the Tamil Nadu side. Each big plant then pulled in dozens of small vendors. By 2009, Business Standard counted about 1,500 small and tiny units in Hosur, 75% of them making components for the auto industry 34.
How the business works
The chain from steel to scooter
A vehicle has thousands of parts, and in Hosur most of them pass through more than one small firm before they reach an assembly line. A simplified chain looks like this:
- Raw material: steel sheet and bar, aluminium, rubber, plastics, copper wire. Most of it is bought from mills, distributors and traders in Bengaluru and Chennai.
- Job work: small units in Hosur turn that material into parts. They do pressing and sheet-metal work, CNC turning and milling, welding, die-casting, plating and painting, and rubber and plastic moulding. The 2022 dispute described below was about exactly these processes 31.
- Tier-2 and tier-1 suppliers: larger firms take machined or pressed parts and build sub-assemblies such as frames, brackets, wiring harnesses, brake parts and seats. They supply these straight to the vehicle maker.
- Vehicle makers: TVS, Ashok Leyland, Ather and Ola assemble finished vehicles. They send them to dealers across India and, for TVS, to export markets.
The small units mostly work to the buyer's drawing, on the buyer's schedule, and often with the buyer's material. That is efficient. It also means a Hosur job-worker's fortunes rise and fall with one or two customers. In 2013, Autocar Professional reported that "around 500 to 600 tiny auto ancillary units in Hosur depend on" TVS and Ashok Leyland 56.
Who sets the price
The sharpest public account of how money moves came in July 2022. The Hosur Small and Tiny Industries Association (HOSTIA) called a two-day strike. It wanted common costing norms for pressing, welding, CNC machining and rubber and plastic parts 31. On the strike day, the association's president said about 3,000 MSMEs and nearly 1 lakh workers had joined. He put the expected production loss at Rs 500 crore 31.
HOSTIA's president told KNN India that prices "have remained unchanged for the last 15 years", even as steel, power and wages rose 32. Public reporting we found does not record how the dispute was finally settled.
For an owner, the lesson is that the job-worker carries the input-cost risk unless the contract says otherwise. Price escalation clauses linked to steel or power are worth fighting for.
Suppliers near the plant
Vehicle makers want suppliers close by, so that parts can arrive several times a day and stock stays low. TVS says in its 2024-25 sustainability report that it "encourages Tier-1 suppliers to establish manufacturing facilities near its plants" 9. The same report shows that 84% of TVS's inputs were sourced directly from within India in FY25, down from 93% the year before. The share bought directly from MSMEs and small producers was 4.4%, down from 6.62% 9. This is direct buying only. Many small Hosur units supply TVS's tier-1 suppliers rather than TVS itself.
Ola took the idea furthest. Its 2024 prospectus says the Tamil Nadu government reserved 700 acres next to its EV hub, for two years, for suppliers who wanted to set up alongside it 16.
The EV turn
Three e-scooter makers in one district
In March 2023 Business Standard noted something striking. The top three electric two-wheeler makers that February, Ola, TVS and Ather, were "all based in Krishnagiri district, two in Hosur and one in Pochampalli" 30.
Ather Energy builds its scooters and battery packs at two facilities near Hosur. Its 2025 prospectus says they could make 4,20,000 scooters and 3,79,800 battery packs a year as of December 2024 14. The line could assemble a scooter in 43 seconds and a battery pack in 61 seconds. In the nine months to December 2024, however, the scooter line ran at 39% of capacity 14. In other words, it was built ahead of demand.
Ather sourced 75% of its material cost within India in that period 14. Its battery cells came from two suppliers abroad, in China and South Korea 14. Ather told investors in May 2025 that it sold 1,55,000 units in FY25 and that Hosur "can produce 35,000 units a month" 15. In October 2026 its board approved about Rs 122 crore to raise Hosur capacity to 4,95,000 units by December 2026 50. A second factory, at Chhatrapati Sambhajinagar in Maharashtra, is being built in phases 14, 50.
Ola Electric's Futurefactory sits on 134.95 acres in Krishnagiri district. It reached an installed capacity of 10 lakh scooters a year by March 2024 16. Next to it, Ola is building a lithium-ion cell plant (the "Gigafactory") under the government's battery cell incentive scheme, the ACC PLI. In November 2026 Ola told shareholders it had reached the scheduled commercial operation date for 6 GWh of cell capacity, and that the government had extended its PLI to calendar year 2031 18.
Ola's sales have fallen sharply. Deliveries dropped from 3,07,846 units in FY25 to 1,73,794 in FY26, and revenue from operations fell from Rs 4,514 crore to Rs 2,253 crore 17. For local suppliers, this shows the risk of building capacity for a single customer whose volumes can halve in a year.
TVS Motor builds its iQube electric scooter at Hosur. The one-millionth iQube came off the Hosur line in June 2026 11. TVS's EV two-wheeler sales rose 44% to 2.8 lakh units in FY25 8. Across the company, TVS sold 58.89 lakh vehicles in FY26, including 3.71 lakh EVs, on revenue of Rs 47,270 crore 10. Hosur also builds motorcycles for BMW Motorrad: the 200,000th rolled out of the Hosur facility in December 2025 12.
What their sales add up to
In FY26, Indians registered about 14 lakh electric two-wheelers. TVS led with 3,40,758, Ather had 2,38,461 and Ola 1,64,215, according to Vahan figures reported by Autocar Professional 41. Together that is 7,43,434 units, or about 53% of the market (our calculation). Not every one of those scooters was built in Krishnagiri district. But the bulk of the volume of all three makers comes from plants there 11, 14, 16.
The Tamil Nadu government's investment agency says nearly 60% of India's electric two-wheelers roll out of Tamil Nadu, and that the state makes about 35% of India's auto components 22. The page is undated, so treat it as the state's own estimate rather than a fixed figure.
What the EV turn means for small suppliers
An electric scooter has no engine, gearbox, fuel tank or exhaust. Those are exactly the parts many Hosur machine shops grew up making. The iFOREST-CII study estimated that about 20% of Hosur's 759 auto component makers would be "highly or moderately impacted" by the shift 33.
The new parts are different: battery pack enclosures, motor housings, controllers, wiring, and aluminium castings for lighter frames. A firm that can make these to tight tolerance has a new market on its doorstep. Ather's top suppliers, listed in its prospectus, include Indian names such as Rockman, Gabriel India and Brembo India alongside cell makers abroad 14.
The numbers
The national picture Hosur feeds
India's auto component industry turned over Rs 7,59,234 crore (about US$85.9 billion) in FY26, up 12.7% 24. Exports were US$24 billion and imports US$25.4 billion, according to ACMA, the industry body 24. That leaves imports about US$1.4 billion higher than exports (our calculation). China is the largest single source: Autocar Professional reported that it supplied 36% of India's auto component imports in FY26 53.
EV parts made up just 4.6% of domestic supplies to vehicle makers in FY26, not counting lithium-ion batteries 24. So the switch is real but still early.
Hosur's own numbers
No single official count covers the whole Hosur cluster, so the figures below come from different sources and periods. Read them as a range rather than one total.
- Units: About 1,500 small and tiny units in 2009 34; "more than 2000" general engineering firms in the district export plan 4; about 3,000 MSMEs in 2022 and 2025 reporting 31, 51.
- Registrations: 1,03,019 MSMEs in Krishnagiri district registered on Udyam and the Udyam Assist Platform between July 2020 and August 2024. Of these, 1,01,357 were micro enterprises 5. This covers all sectors, including traders and service firms.
- Exports from the district: In FY21, motorcycles exported from the district were worth US$390.7 million, three-wheelers US$216.8 million and motorcycle parts US$112.2 million 4.
- Land: SIPCOT runs Hosur (2,093 acres), Shoolagiri (689 acres) and a 300-acre Future Mobility Park at Shoolagiri, among other parks in the district 2. In June 2023 the Chief Minister launched a Rs 182 crore, 20 MLD plant that treats waste water for about 800 industrial units in the Hosur and Shoolagiri estates 3.
- New investment: A Hosur investors' meet in September 2025 drew Rs 24,307 crore in commitments across 92 agreements, promising 49,353 jobs, DT Next reported 40.
What it is up against
One or two customers
The clearest risk is the one the 2009 and 2013 downturns exposed. When vehicle sales fell in late 2008, Business Standard reported that about 4,000 jobs were lost in Hosur's small units in three months 34. Many vendors still depend on a handful of buyers. The EV market adds new buyers, but it also adds volatility, as Ola's FY26 numbers show 17.
Power cost and power supply
In 2013, during statewide power cuts of 14 to 16 hours a day, HOSTIA said more than 500 Hosur units had shut in nine months 35. Supply has improved since, but cost has become the issue.
After Tamil Nadu's 2022 tariff revision, about 165 MSME associations across the state went on strike in September 2023, demanding that the new fixed charges be rolled back and annual hikes stopped 47. The July 2025 revision raised tariffs by 3.16%. The state absorbed the increase for micro and small units on low-tension connections up to 50 kW. High-tension users, which include most mid-sized factories, pay it in full 46.
Rare earths and imported cells
Electric motors need rare-earth magnets, and most of them come from China. From April 2025, China held magnet shipments at its ports under a new permit system, Reuters reported 42. Bajaj Auto's Chetak production fell 47% in July 2025 compared with a year earlier, and an executive said output was hit "to the extent of 50%" 43. Ather's CEO said the shortage could cost about a week of supply to dealers in that quarter, and that Ather was moving to motors using light rare earths or ferrite 54.
Cells are the same story. Ather's prospectus lists cell suppliers in China and South Korea 14. That is why the Ola cell plant, and the government's battery cell PLI behind it, matters for the region 18.
US tariffs
North America took 32% of India's auto component exports in FY25 25. The US placed a 25% tariff on imported auto parts from May 2025 29. In August 2025 an extra duty took the total on most Indian goods to 50% 45. In January 2026 ACMA said existing supply to the US had held up but new contracts were "a little bit in limbo" 44. In February 2026 the US cut its tariff on India to 18% under a trade deal 45. From Krishnagiri district, more vehicles than loose parts go abroad 4, but suppliers feel any slowdown in their buyers' exports.
Labour
The district export plan lists attrition among migrant workers, labour shortages and rising labour cost as challenges. It also notes that 60% of labourers are women 4. Nationally, an ACMA–BCG study of 450 companies found that 61% of auto parts suppliers reported a critical shortage of workers 49.
Infrastructure that has not arrived
In June 2024 the Tamil Nadu government announced a 2,000-acre airport for Hosur, designed for 3 crore passengers a year 52. By December 2025 the land plan had grown to 2,979 acres across 12 villages 38. In February 2026, however, the Civil Aviation Minister told the Rajya Sabha that the Centre had not recommended the proposal, because the site lies in HAL's flight-test airspace 39. For now, air freight still runs through Bengaluru. Water is another limit: in 2022 Deccan Herald reported that the town had 10 MLD of water available against demand of 27 MLD, even as Rs 21,424 crore had been invested in Hosur since 2017, Rs 5,539 crore of it in automobiles 55.
Where it is going
Tamil Nadu is betting that Hosur moves from making parts to designing and powering vehicles. Its 2023 EV policy targets Rs 50,000 crore of investment in EV manufacturing and 1.5 lakh new jobs 21. The 2025-26 state budget announced a Tidel Park in Hosur covering 5 lakh sq ft and a "Hosur Knowledge Corridor" for R&D and global capability centres 23. In the 300-acre Future Mobility Park at Shoolagiri, land had been allotted to 22 firms by September 2025, according to DT Next 40.
National policy supports the shift but is tapering. The government's PM E-DRIVE scheme now pays Rs 2,500 per kWh on electric two-wheelers, capped at Rs 5,000 a vehicle, and runs to March 2028 26. The vehicle-industry PLI scheme has an outlay of Rs 25,938 crore 28.
On the petrol side, the September 2025 GST cut helped too. Two-wheelers up to 350cc and all auto parts moved from 28% to 18% GST 27, which lowers prices for the motorcycles and scooters that most Hosur suppliers still serve.
The likely future is a town that does both for years. Engine and gearbox work will continue for domestic and export motorcycles and for Ashok Leyland's trucks. Next to it, a newer layer will make battery packs, motor parts, castings, electronics and cells. The firms that do best will be the ones that can win business from more than one of these buyers, and that can document quality and cost well enough to be trusted with new parts.
What a growing business can take from this
Price contracts need an escape valve. HOSTIA's complaint was prices that had not moved in 15 years while inputs rose 32. Tie your rates to a steel, aluminium or power index, and review margins job by job every quarter rather than once a year.
No single customer should be half your sales. Ola's deliveries fell about 44% in one year (our calculation from 17). Map your revenue by customer each month, and set a hard ceiling on how much any one buyer can be.
Capacity is not demand. Ather's state-of-the-art line ran at 39% of capacity for nine months 14. Before adding a shift or a machine, look at confirmed orders and the buyer's schedules, not their projections.
Be close, and be visible. Buyers want vendors near the plant and parts delivered on time, every time 9. A vendor who can show real-time stock, delivery history and rejection rates gets the next part number.
Plan for the product that replaces yours. If you machine engine or gearbox parts, start now on one EV part, such as battery enclosures, motor housings or castings. Run it as a small, costed project rather than a bet of the whole firm.
Know your labour, shift by shift. With migrant attrition and a national shortage of workers 4, 49, firms that track attendance, skills and overtime by shift can plan output and keep good people.
Running a business like this?
The problems in Hosur show up in any growing manufacturer: prices that do not keep up with costs, one customer dominating sales, stock and job work scattered across vendors, and shifts that are hard to staff. OneHash puts sales, stock, purchase, production, accounts and HR in one system. Quotes and orders flow into Manufacturing, Inventory and warehouses, and Quality control. Purchase management and Receivables and payables show what each order really earns, while Profitability insights flag thin jobs early. Shift and attendance and Payroll keep the shop floor in view. See manufacturing, and compare clusters such as Kolhapur and Rajkot.
Based on public records and reporting as of 20 November 2026. For general reading; not investment, tax or legal advice.
Questions people ask
Why is Hosur famous for industry?
Hosur, in Krishnagiri district of Tamil Nadu about 40 km from Bengaluru, grew around TVS Motor, Ashok Leyland and Titan after it was declared a backward area with incentives in the 1970s. It now has about 500 big industries and around 3,000 MSMEs, many of them making auto components.
Which EV companies have factories in Hosur and Krishnagiri district?
TVS Motor builds its iQube electric scooter at Hosur, Ather Energy has two facilities near Hosur, and Ola Electric's Futurefactory and cell Gigafactory are in Krishnagiri district. Together TVS, Ather and Ola had about 53% of India's electric two-wheeler registrations in FY26.
How big is the SIPCOT industrial park in Hosur?
SIPCOT's Hosur industrial park (Phase I and II) covers 2,093 acres. The district also has SIPCOT parks at Shoolagiri, including a 300-acre Future Mobility Park.
How many MSMEs are there in Hosur?
Reports put the number at about 3,000 MSMEs in and around Hosur. In Krishnagiri district as a whole, 1,03,019 MSMEs registered on Udyam between July 2020 and August 2024, almost all of them micro enterprises.
What is Ather Energy's Hosur factory capacity?
Ather's Hosur facilities could make 4,20,000 electric scooters and 3,79,800 battery packs a year as of December 2024, according to its prospectus. In October 2026 Ather approved about Rs 122 crore to raise scooter capacity to 4,95,000 units.
What challenges do Hosur auto component makers face?
Small suppliers depend on a few large buyers, and in 2022 the HOSTIA association struck over prices it said had not changed for 15 years. Other pressures include power costs, rare-earth magnet supply from China, US tariffs, labour shortages and the shift from engine parts to EV parts.
Is Hosur getting an airport?
Tamil Nadu announced a greenfield airport for Hosur in June 2024, but in February 2026 the Centre told Parliament it had not recommended the proposal because the site lies in HAL's flight-test airspace.
Sources
- Policy Note 2023-24: SIPCOT industrial parks - SIPCOT, Nov 2026
- Industries Department Policy Note 2024-25 - Government of Tamil Nadu, Nov 2026
- SIPCOT projects: Hosur tertiary treatment plant - SIPCOT, Nov 2026
- District Export Action Plan: Krishnagiri - Tamil Nadu MSME Department, Nov 2026
- Lok Sabha Unstarred Question 2879: Udyam registrations by district - Ministry of MSME, Aug 2024
- District Skill Development Plan: Krishnagiri - Tamil Nadu Skill Development Corporation, Nov 2019
- About Hosur City Municipal Corporation - Government of Tamil Nadu, Nov 2026
- Annual Report 2024-25 - TVS Motor Company, Jul 2025
- Business Responsibility and Sustainability Report 2024-25 - TVS Motor Company, Jul 2025
- FY2025-26 results press release - TVS Motor Company, May 2026
- One millionth TVS iQube rolled out - TVS Motor Company, Jun 2026
- Management Discussion and Analysis, Annual Report 2025-26 - TVS Motor Company, Nov 2026
- Manufacturing plants - Ashok Leyland, Nov 2026
- Red Herring Prospectus - Ather Energy Ltd (SEBI), Apr 2025
- Q4 FY25 earnings call transcript - Ather Energy, May 2025
- Red Herring Prospectus - Ola Electric Mobility Ltd, Jul 2024
- Shareholders' letter Q4 FY26 - Ola Electric Mobility, May 2026
- Shareholders' letter Q2 FY27 - Ola Electric Mobility, Nov 2026
- Business Responsibility and Sustainability Report 2025-26 - Titan Company, Jul 2026
- Perkins Hosur facility - Perkins Engines, Nov 2026
- Tamil Nadu Electric Vehicles Policy 2023 - State Planning Commission, Tamil Nadu, Nov 2026
- Automobile, auto components and EV sector - Guidance Tamil Nadu, Nov 2026
- Budget Speech 2025-26 - Finance Department, Government of Tamil Nadu, Mar 2025
- Auto component industry performance FY2025-26 - ACMA, Jul 2026
- Auto component industry performance FY2024-25 - ACMA, Jul 2025
- PM E-DRIVE scheme factsheet - Press Information Bureau, Oct 2026
- GST rate rationalisation: key changes - Press Information Bureau, Sep 2025
- PLI scheme for automobile and auto component industry - Ministry of Heavy Industries, Mar 2025
- Adjusting imports of automobiles and automobile parts into the United States - The White House, Mar 2025
- Tamil Nadu's Hosur belt switches on as hub for EVs, ancillary units - Business Standard, Mar 2023
- Hosur MSMEs launch two-day strike, want new costing norms - Deccan Herald, Jul 2022
- MSMEs in Hosur threaten strike against payment delays, unfair price - KNN India, Jul 2022
- EV transition to impact auto component players, says report - DT Next, Apr 2024
- Auto slowdown hits Hosur manufacturing units - Business Standard, Feb 2009
- Slow and unsteady - Outlook Business, Mar 2013
- Growing pains - Outlook Business, Apr 2012
- 40 years of Titan Company - Tata Group, Nov 2024
- Hosur airport: 2,900 acres to be acquired from 12 villages - Deccan Herald, Dec 2025
- Centre says no again to Hosur airport citing HAL airspace - DT Next, Feb 2026
- Hosur investors meet attracts Rs 24,307 crore investment across key sectors - DT Next, Sep 2025
- India e2W registrations rise 22% to 1.4 million units in FY26 - Autocar Professional, Apr 2026
- Chinese export curbs on rare earth magnets could disrupt Indian auto production - Autocar Professional, May 2025
- Bajaj Chetak production plunges 47% in July due to rare earth magnet shortage - Autocar Professional, Aug 2025
- New supply contracts to US in limbo amid tariff woes: ACMA - Autocar Professional, Jan 2026
- Indian industry leaders welcome India-US trade deal as tariffs reduced to 18% - Autocar Professional, Feb 2026
- Power tariff hiked; domestic consumers, small traders, industries spared - DT Next, Jul 2025
- MSMEs in Tamil Nadu go on strike over rising power costs - Business Standard, Sep 2023
- Tata to double headcount to 40K in its Hosur iPhone plant - Inc42, Sep 2024
- Labour deficit hits 61% of Indian auto suppliers as sectors compete for talent - Autocar Professional, Sep 2026
- Ather Energy to invest Rs 122 crore in manufacturing capacity expansion - Autocar Professional, Oct 2026
- Don't slow down work on airport for Hosur, industry bodies to Tamil Nadu - Deccan Herald, Jan 2025
- Spanning 2,000 acres: Tamil Nadu lays out plan for a new international airport in Hosur - Business Today, Jun 2024
- China solidifies its grip as India's primary source for auto components with 36% share of imports - Autocar Professional, Jul 2026
- Ather sees 7-day dealer supply impact from magnet shortage - Autocar Professional, Aug 2025
- On Bengaluru's doorstep, Hosur's meteoric rise - Deccan Herald, Apr 2022
- Hosur vendors charge destiny - Autocar Professional, Jan 2013